Empire Comfort Systems OLP42FP72S-2 Owner's Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
32274-8-0115 Page 7
Model OLP36FP OLP42FP
Input Maximum 36,000 40,000
Minimum 28,000 LP / 27,000 NAT 28,000 LP / 28,000 NAT
Orice P245 #50 LP / P209 #31 NAT P265 #49 LP / P209 #31 NAT
Air Shutter Opening LP Full Open / Nat 1/8" Open LP Full Open / Nat. 1/8" Open
Accessories
BD36SS 36" Bifold Glass Door - Stainless Steel
BD42SS 42" Bifold Glass Door - Stainless Steel
DT36SS 36" Drain Tray - Stainless Steel
DT42SS 42" Drain Tray - Stainless Steel
WD36SS 36" Weather Door - Stainless Steel
WD42SS 42" Weather Door - Stainless Steel
SPECIFICATIONS
Checkalllocalcodesforrequirements,especiallyforthesizeand
typeofgassupplylinerequired.
Recommended Gas Pipe Diameter
Pipe Length Schedule 40 Pipe
Inside Diameter
Tubing, Type L
Outside Diameter
Nat. L.P. Nat. L.P.
0-10 feet
0-3 meters
1/2”
12.7mm
3/8”
9.5mm
1/2”
12.7mm
3/8”
9.5mm
10-40 feet
4-12 meters
1/2”
12.7mm
1/2”
12.7mm
5/8”
15.9mm
1/2”
12.7mm
40-100 feet
13-30 meters
1/2”
12.7mm
1/2”
12.7mm
3/4”
19mm
1/2”
12.7mm
100-150 feet
31-46 meters
3/4”
19mm
1/2”
12.7mm
7/8”
22.2mm
3/4”
19mm
Note:Neveruseplasticpipe.Checktoconrmwhetheryourlocal
codes allow copper tubing or galvanized.
Note: Since some municipalities have additional local codes, it is
always best to consult your local authority and installation code.
Note: Be sure to install gas line cover to appliance prior to completing
gas line connection.
Installing a New Main Gas Cock
Eachapplianceshouldhaveitsownmanualgascock.
Amanualmaingascockshouldbelocatedinthevicinityoftheunit.
Wherenoneexists,orwhereitssizeorlocationisnotadequate,
contact your local authorized installer for installation or relocation.
Compounds used on threaded joints of gas piping shall be resistant
totheactionofliqueedpetroleumgases.Thegaslinesmustbe
checkedforleaksbytheinstaller.Thisshouldbedonewithasoap
solution watching for bubbles on all exposed connections, and if
unexposed, a pressure test should be made.

be disconnected from piping at inlet of control valve and pipe
capped or plugged for pressure test. Never pressure test with
appliance connected; control valve will sustain damage!
A gas valve and ground joint union should be installed in the gas
lineupstreamofthegascontroltoaidinservicing.Itisrequiredby
the National Fuel Gas Code that a drip line be installed near the gas
inlet. This should consist of a vertical length of pipe tee connected
into the gas line that is capped on the bottom in which condensation
and foreign particles may collect.
The use of the following gas connectors is recommended:
ANS Z21.24 Appliance Connectors of Corrugated Metal Tubing
and Fittings
ANS Z21.45 Assembled Flexible Appliance Connectors of Other
Than All-Metal Construction
The above connectors may be used if acceptable by the authority
havingjurisdictionThestateofMassachusettsrequiresthataexible
appliance connector cannot exceed three feet in length.
Figure 1
GAS SUPPLY
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 23 24

Comments to this Manuals

No comments